
------------------------------------------------------------------------------
A versatile, high-energy professional with the merit of executing prestigious projects of large magnitude within strict time schedules, cost & quality
Location Preference: Odisha/Overseas
SIMANTA KUMAR NAYAK
Construction Management/ Infrastructure Management
Executive Profile
A competent professional with over 26 years of experience in Construction Management, Site and Project Management
Skilled in monitoring & controlling of the Work Execution in line to the Interior & Civil Quality Standards
Gained experience in project management activities including project scoping, estimation, planning, finalization of technical specifications, resource administration and quality management for the projects
Skilled in implementing value engineering to improve work quality; achieving and cost savings and providing optimal solutions
Experience of managing various projects related to Heavy Earthwork & Railway, Lay Down, Hard Stand ,Oil & Gas Pipe Line laying, Industrial Roads, Land Development, Approach Road, Jetty, Rig Foundation, Warehouse Buildings, Flow Station, (Tank Farm, Pipe Rack, Compressor Foundations, MCC Building) Airport Construction (Run way & Building) by latest techniques using mechanized means
Extensive exposure in construction, design development process, tender documentation, and tender process
Possesses comprehensive understanding of project controls including cost estimation, budgeting, cost control, cost reporting and contract & subcontract management
Excellent relationship management, analytical and negotiation skills with capability in swiftly ramping projects in coordination with Consultants & sub-contractors
Core Competencies
Project ManagementConstruction Management
Site Management
Variance Analysis
Quality Control
Manpower Managment
Value Engineering
Erection & Commissioning
Team Management
Career Timeline
Aug’02- May’03 Jan’19 to till Jun’16- Dec’18 Dangote Oil Refineries NigeriaElsamex (Spain) JV. (BOTSWANA) Sterling Oil and Gas (Nigeria ) Jan’09-Jun’16 Jan’06-Nov’08 May’03-Dec’05 Sheladia Associates INC, (USA) Nicco Corporation Project Division Halcrow Consulting, Uk
Professional Experience
Dangote Oil Refineries ( NIGERIA) Jan’19- till date
GM Infrastructures & Construction(Off sites) Civil
Role:
Administering all construction activities including providing technical inputs for methodologies of construction & coordinating for site management activities; preparing micro/weekly schedules to achieve the macro goals and allocating the resources as per the schedule
The refinery is situated on a 6,180 acres (2,500 hectares) site at the Lekki Free Zone, Lagos State. It will process about 650,000 barrels of crude oil daily, where natural gas will also be sourced to supply the fertilizer factory and be used in electrical generation for the refinery complex. The project cost up to $15 billion in total, with $10 billion invested in the refinery, $2.5 billion in the fertilizer factory, and $2.5 billion in pipeline infrastructure.
With a single crude oil distillation unit, At full production, the facility will be able to produce 50,000,000 litres (13,000,000 US gal) of gasoline and 17,000,000 litres (4,500,000 US gal) of diesel daily, as well as aviation fuel and plastic products. With a greater capacity than the total output of Nigeria's existing refining infrastructure .
Construction of Land Development (Hydraulic Dredging) & Grading for sites Preparation, Laydown Area, Hard Stand area, Utility facility, Road & Drains , Culverts, Internal Paving ,preparation facility for pipeline laying (Pipe Rack ,PWC ) ,Foundation for warehouse, Diesel tank storage pad, Approach Roads. Monitoring of all road Construction activities (124 Km) Stone base & Concrete Road ( Rigid Pavement ) Preparation of the Embankment, Sub grade, & Sub base as per Drawing.
Attending Safety Training Program for knowing the risks involved in different kind of jobs and receiving the required Certification for supervising the same.
Ensure that work is being carried out following all Safety Standards specified for the Project and Work Environment.
Review the ITB (Invitation to Bid) documents received in the proposals stage, issue inquiry requisitions, review techno-commercial vendor offers, prepares equipment, material and man-hour estimates. Establish engineering deliverables for earth works, concrete works, steel works, road works and other related civil works. · Verify scope of work, budgeted man-hours, and budgeted quantities, total of deliverables, format of delivery, time schedules and other specifications for execution of the work
, Line Drain, Protection Work including roads & other so many miscellaneous structural works also
Administering all construction activities including providing technical inputs for methodologies of construction & coordinating for site management activities; preparing micro/weekly schedules to achieve the macro goals and allocating the resources as per the schedule
Preparing construction schedule in conjunction with the contractors with details of specific activities and respective dates of completion
Reviewing contract requirements for project execution, organizing the preparation of the Technical Document Register (TDR), and identifying requirements and scope of work, review specifications, plot plans, General Arrangement (GA) drawings, Review Philosophies and other relevant documents
Monitoring project schedule and its implementation to ensure its completion within the targeted time frame, quality and cost . Ensuring that all works exected are in accordance to the drawings, specifications, construction plan, procedures method statements; managing quality assurance & control function while providing technical inputs for latest Technology and methodologies
Previous Experience
Elsamex (Spain) ( BOTSWANA) Jun’16-Dec’18
Snr Project Manager Construction Civil
Role:
Administering all construction activities including providing technical inputs for methodologies of construction & coordinating for site management activities; preparing micro/weekly schedules to achieve the macro goals and allocating the resources as per the schedule
Preparing construction schedule in conjunction with the contractors with details of specific activities and respective dates of completion
Reviewing contract requirements for project execution, organizing the preparation of the Technical Document Register (TDR), and identifying requirements and scope of work, review specifications, plot plans, General Arrangement (GA) drawings, Review Philosophies and other relevant documents
Monitoring project schedule and its implementation to ensure its completion within the targeted time frame, quality and cost
Ensuring that all works exected are in accordance to the drawings, specifications, construction plan, procedures method statements; managing quality assurance & control function while providing technical inputs for latest Technology and methodologies
Analyzing scope of work from client, designing review, coordinating with consultants and sub-contractors during execution
Performing Material inspection and preparing quality data sheets in coordination with contractors; conducting progress review meeting with contractors on weekly basis
Collaborating with various agencies at site for the smooth progress of works
Developing detailed budgets & project baselines, monitoring and controlling projects with respect to cost, resource deployment, time overruns and quality compliance to ensure satisfactory execution of projects; performing Tender estimation and supporting document preparation work
Maintaining drawing register and documents; drafting CAD drawings for execution and modification; approving the quantities constituent materials from civil & structural drawings
Inspecting field sites to observe & evaluate condition & operability of facilities and to collect field survey data
Managing cost reporting of all allocated projects including Cost Forecasting, Anticipated Final Cost, Cost of Work Done, Gross Billing and Current Contract Value
Ensuring site safety on top priority with 100% quality of work, zero wastage of material, on time execution of project and using environmental friendly material for execution
Highlights:
Executed various projects such as:
o The Connectivity Express Way & Internal State Highway Construction
o Kanye Botswana( world Bank Aided ), Procedure of Roads (Four lane) Flexible Pavement & Some Section
o Rigid Pavement( Nearly 350 Km Cost $874), Budgeting, Planning, Execution of (ASTM ) Box Culvert, Pipe Culvert, Line Drain, Protection Work including roads & other so many miscellaneous structural works also
Sterling Oil Global Resources, Nigeria Jan’09-Jun’16
Snr Manager Construction/Project Manager-Civil
Role:
Performed construction of Land Development (Hydraulic Dredging) & Grading for Drill Sites Rig Pad Construction, Mud Pump Foundation, Chemical Storage, Diesel Tank Storage Pad and Approach Roads
Monitored all road construction activities (60 Km) StonebaseMC1, A.C. Preparation of the Embankment, Sub grade, & Sub base as per drawing
Established 40000 Barrel each day Capacity of Flow Station 2No, Land Development Heavy Earth Work, Dredging, Tank farms, Compressors Foundation, Flare stack Foundation, Dyke Wall, Control Rooms, and Accommodations
Developed:
o Pipe Rack Foundation & Internal roads
o Construction Procedure of Roads (10 Mtr Width) 60 Km Long Stone base, MC1, & A.C, Oil & gas Pipe Line Laying (8 Inch Oil Line6 Inch Gas Line)
Supervised structural of Jetty Facilities ( 40000 Barrel) for Crude Transportations, Jetty Land Development, Control Rooms, Jetty Piling, Gangway Placing, Dolphin Piling & also Protection Work in Shore Area
Attended Safety Training Program for knowing the risks engaged in different kind of jobs and received the required certification for supervising the same; ensured that work is being executed following all Safety Standards specified for the project and work environment
Reviewed the ITB (Invitation to Bid) documents received in the proposals stage, issued inquiry requisitions, reviewed techno-commercial vendor offers, prepared equipment, material and man-hour estimates
Established engineering deliverables for earth works, concrete works, steel works, road works and other related civil works
Verified scope of work, budgeted man-hours and budgeted quantities, total of deliverables, format of delivery, time schedules and other specifications for execution of the work
Halcrow Consulting, Uk as Snr. Construction Manager Jan’06-Nov’08
Established 12000 Barrel each day Capacity of Flow station, Land Development Heavy Earth work , Tank farms, Compressors Foundation, Flare stack Foundation , Dyke Wall ,Control Rooms , Accommodations. Pipe Rack Foundation & Internal roads Developed.
Established 40000 Barrel each day Capacity of Flow station 2No, Land Development Heavy Earth work, Dredging, Tank farms, Compressors Foundation, Flare stack Foundation, Dyke Wall, Control Rooms, and Accommodations. Pipe Rack Foundation & Internal roads Developed. Developed Construction Procedure of Roads (10 Mtr Width) 60 Km Long Stone base, MC1, & A.C, Oil & gas Pipe Line Laying (8 Inch Oil Line6 Inch Gas Line).
Supervision of structural of Jetty facilities ( 60000 Barrel) for Crude Transportations .Jetty land development, Control Rooms, Jetty Piling, Gangway Placing, Dolphin Piling,& Also Protection work in Shore Area
Supervising and assigning work schedule Prepares and provision of access road, Rig pad ,Maintenance Building &.Well site Construction works for drilling programmed in Block CR-ON- 81 at Hailakhandi, Canhan Pur, Block CR- ON – 90/1 in Masimpur -3.
Implementing approved plans and supervision as per instructions
Performs other duties that are related to skills.
Attending Safety Training Program for knowing the risks involved in different kind of jobs and receiving the required Certification for supervising the same.
Ensure that work is being carried out following all Safety Standards specified for the Project and Work Environment.
Sheladia Associates INC, USA as Field Inspector (Roads & Highway) May’03-Dec’05
G.S.H.P – 7, FOUR LANE HIGHWAY 120 KM (WORLD BANK AIDED) GUJRAT, INDIA
Nicco Corporation Project Division ( ISO9002) as Site In-charge Roads Aug’02-May’03
Projects Executed: Outer Ring Road (A .D. B Aided Project) Bhuj, Gujarat, India
Oriental Structural Engineers Ltd. & Sang Young (Korea) as Site Engineer Roads Feb’01-Jul’02
Projects Executed: Third National highway World Bank Project (Four Laning & Strenghten),
Nh-2 Rigid Pavement
Orientla Structural Engineers Ltd. & Mitsui Marubeni, Japan as Site Engineer Roads Nov’98-Jan’01
Project Executed: Delhi Noida Expressway (8 Lane Expressway)
Orientla Structural Engineers Ltd., Location as Assistant Engineer May’97-Oct’98
Project Executed: Air Field Construction ( M.E.S) Bhuj
Tantia Construction Ltd. as Site Engineer Roads Jan’95-Apr’97
Project Executed: Sersah Surimarg ( Panipat to Karnal) 4 Laning & Strengthening (NH-1)
Education
Masters in Civil Engineering from manav bharti university( Transportation ) HP in 2012
B.Tech (Civil Engineering) from Bundelkhand University in 2000 .
Diploma in Civil Engineering from Sanjya Memorial Institute of Technology in 1995.
Certifications
Botswana Certified ERB Registered Professional Eng (No ERB-PC-04410)
Nigeria COREN Certified Engineer Reg. (No P.1365)
Confederation of Engineers (India) Chartered Engg. Reg. No. (CE/LM/M-110790-16)
The Institution of Engineering and Technology Reg. No. (1100509366)
Indian Concrete Institute Life Member Reg. No. (L.M -11714)
Association of Consulting Civil Engineers (India) fellow member No (4331-F)
IRC life Membership (eLM-101754 )
ASTM International Membership No ( 2304061
Personal Details
Date of Birth: 30th June 1972Languages Known: English, Hindi, and Oriya
Passport No.: Z3705231 (Valid up to Aug 2026)
Address: Kapila Prasad, Bhubaneswar, Khurdha District, Odisha-751002
Last Resume Update | March 14, 2021 |
Address | BHUBANESWAR, India |
[email protected] | |
Phone Number | 9776600660 |
Education
M.Tech Civil Engineering ( Transportation and Highway)
BACHELOR OF CIVIL ENGGINEERING
DIPLOMA IN CIVIL ENGINEERING